Oakura School

Coastal School

Project Goal: To supply the steel canopy frames for Oakura School’s outdoor education space. Pre-planning: The installation for this project needed to be completed while the school was operating. Result: A successful install that was on time and on budget.

PIHMS Stairs

Custom Fabrication Stairs

Project Goal: To replace the existing non-compliant first floor balustrade and worn out wooden staircases. Prework and Planning: Fabrication and installation had to be carried out while the facility remained operational. The design was structured so that the existing balustrade and stairs remained in place while new ones were installed. Another challenge was getting everything […]